Issue - meetings

Highway Asset Management - Network Recovery Plan Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation

Meeting: 11/01/2016 - Environment and Climate Change Committee (Item 12)

12 Highway Asset Management - Network Recovery Plan Whole Life Costing of Footway Maintenance Treatments pdf icon PDF 533 KB

Additional documents:

Minutes:

The Commissioning Director for Environment introduced the report, which explained the concept of whole life costing highway asset management, and referenced a “toolbox” of standardised construction designs. 

 

Following a question from a Member, the Commissioning Director for Environment undertook to discuss gradients and crossovers with engineers in relation to whole life costing of footways.

 

Councillor Brian Salinger MOVED the following motion:

 

That two more roads be tried out, with one that it is a typical road with crossovers, and one without crossovers so that Committee Members can consider that before taking any decisions in principle, and that the decision on whole life principles can be deferred.”

 

Votes were recorded as follows:

 

For

11

Against

0

Abstentions

0

 

The motion was CARRIED and became the substantive motion.

The Committee RESOLVED to instruct that two more roads be tried out, with one that it is a typical road with crossovers, and one without crossovers so that Committee Members can consider that before taking any decisions in principle, and that the decision on whole life principles can be deferred.