Agenda item
Parks & Open Spaces Strategy: Draft for consultation
- Meeting of Environment and Climate Change Committee, Monday 11th January, 2016 6.30 pm (Item 8.)
- View the background to item 8.
Minutes:
The Commissioning Director for Environment introduced the report.
Councillor Brian Salinger MOVED the following amendment to Recommendation 3 as set out in the report:
That the
Environment Committee approve that authority be delegated to the
Street Scene Director in consultation with the Chairman of
the Environment Committee Commissioning Director for
Environment to review and amendment of the Events in
Parks Policy and that power to vary to policy on an
experimental basis is granted six months to include providing for events in
the park that might need more than 12
hours than is stipulated in the current policy, and to bring a
report back to committee in six
months.
That the Environment Committee approve that authority be delegated to the Commissioning Director for Environment to review and vary the Events in Parks Policy on an experimental basis for six months for events in the parks that might need more than the 12 hours than is stipulated in the current policy, and to bring a report back to the committee in six months.
Votes were recorded as follows:
For |
6 |
Against |
5 |
Abstentions |
0 |
The motion was CARRIED.
RESOLVED that:-
1. The Environment Committee note the draft Parks and Open Spaces Strategy.
2. That the Environment Committee approve and instruct that the Commissioning Director for Environment to release the draft Parks and Open Spaces Strategy for public consultation.
3. That the Environment Committee approve that authority be delegated to the Commissioning Director for Environment to review and vary the Events in Parks Policy on an experimental basis for six months to include providing for events in the parks that might need more than the 12 hours than is stipulated in the current policy, and to bring a report back to the committee in six months.
Supporting documents:
- Draft Parks and Open Spaces Strategy, item 8. PDF 304 KB
- Appendix 1 Draft Parks and Open Spaces Strategy, item 8. PDF 6 MB
- Figure AI.1 - Parks Typology, item 8. PDF 2 MB
- Figure AI.3 - Areas within 1.2km of a district park, item 8. PDF 1 MB
- Figure AI.4 - Areas within 400m of a local park, item 8. PDF 1 MB
- Figure AI.5 - Combined Catchment Areas, item 8. PDF 1 MB
- Figure AI.6 - Sites of Importance for Nature Conservation, item 8. PDF 1 MB
- Figure AI.7 - Bus Routes, item 8. PDF 2 MB
- Figure AI.12 - Main Neighbourhoof Areas, item 8. PDF 1 MB
- Figure AI.13 - Low ValueQuality and Undesignated Sites, item 8. PDF 838 KB
- Figure AII.1 - All sites surveyed, item 8. PDF 770 KB
- Figure AII.2 - Combined Quality and Value Assessment, item 8. PDF 2 MB
- Figure AII.3 - Sites Recommended for Investment, item 8. PDF 1 MB
- Figure AII.4 - Combined Q&V Assessment- Quadrant Graph, item 8. PDF 533 KB
- Table AII.2 - Quality Assessment_S, item 8. PDF 191 KB
- Table AII.3 - Value Assessment, item 8. PDF 216 KB
- Table AII.4 - Combined Table Assessment, item 8. PDF 66 KB
- AIII.1. Barnett OSS Online Questionnaire Summary Report, item 8. PDF 256 KB
- AIII.2 Barnet OSS Citizens Panel Summary Report(Text Update), item 8. PDF 389 KB
- AIII.3 Barnett OSS Park Events Summary Report, item 8. PDF 85 KB
- AIII.4 Barnett OSS Town Centre Events Summary Report, item 8. PDF 81 KB
- AIII.5 Details of Focus Groups and Telephone Interview, item 8. PDF 553 KB
- AIII.6 Account of Schools Workshops Process, item 8. PDF 539 KB
- AIII.7 Comments from Facebook Barnet parks, item 8. PDF 1 MB
- Appendix 2 Draft Parks and Open Spaces Startegy Summary, item 8. PDF 7 MB