Flower Lane NW7, Mill Hill- Feasibility Study

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decisions:

The committee received the report.

 

Following consideration, the committee unanimously resolved

 

1.    To note the review of the improvements outlined in this report and the appendices to this report and as shown on drawing BC/001410-01-DESIGN-01.

 

2.    To approve the officer preferred Option A with kerb built out and double yellow lines as outlined on Drawing BC/001410-01- DESIGN-01 (“Preferred Scheme”)

 

3.    To authorise the Strategic Director for Environment to carry out a consultation on the Preferred Scheme.

 

4.    That subject to no objections being received to the consultation, referred to in 3 above, the Strategic Director for Environment be authorised to introduce the Preferred Scheme.

 

5.    Should any objections be received as a result of the consultation, referred to in 3 above, the Strategic Director for Environment be authorised to consider and determine whether the Preferred Scheme should be implemented or not, and if so, with or without modification.

 

6.    To approve the allocation of funding of £17,050 from this year’s CIL Area Committee budget to design, consult and introduce the Preferred Scheme.

Publication date: 12/04/2019

Date of decision: 27/06/2018

Decided at meeting: 27/06/2018 - West Area Committee